
Chattooga County Commissioner Blake Elsberry has announced the second road of road paving for 2024 in Chattooga County. Roads included are:
- James Street from Highway 48 to the stop sign. – .4 miles
- East Peach Orchard Road from Highway 48 to the stop sign – 1.4 miles
- West Tate Road from Dry Valley Church Road to Tate Road – .6 miles
- Old Justice Road from Welcome Hill Road to Ridgeway Road to Ridgeway Road Loop – .4 miles
- Cooper Pit Road from Ridgeway Road to Ridgeway Road Loop – .8 miles
- Halls Valley Road from Davis Road to Walker County Line – 1.1 miles
- Long Hollow Road / Welcome Hill Road to Walker County Line – 1.1 miles
- Lon Reynolds Drive/ Lyerly Dam Road to dead end – .3 miles
- Garvin Road from LM Thomas Road to McWhorter Road – 2.1 miles
- Henry Allen Circle off of Johnston Cemetery Road – .3 miles
- Calico Lane from Old Highway 27 to dead end – .1 mile
Commissioner Elsberry says that the cost to pave has gone up exponentially over the past year. According to the commissioner, in 2023 it cost $85,000 to pave 2.2 miles of road. This year, that same amount is costing $150,000.







Comments